Registrations, Ratings and GradingsFull Member Membership Number: 1022 Company Registration Number: 8400976507 BBBEE Rating: 2
Contact DetailsContact Person: Sean Daly Phone: 033 386 9291 Fax: 033 386 9294 Cell: 082 555 1838 Website: www.ampliform.co.za/Construction.htm
Physical Address: 22 Yarborough Road, Mkondeni, Pietermaritzburg, 3201 Postal Address: P.o. Box 100180, Scottsville, 3209
Company Profile
Company Information
Alifab is the fabrication division of Ampliform (PTY) LTD. Ampliform was incorporated in 1984 and has been recognised as a leading manufacturer of aluminium products since then. Ampliform has been involved in a number of exceptional projects over the years and is proud of their association with most of the major players in the South African Industry.
For more details of the products which we have supplied to these projects click the product links and brouse the galleries.
Ampliform is a privately owned company, based in Pietermaritzburg, Kwazulu Natal, South Africa. The company operate out of a 800m2 factory based in Mkondeni Pietermaritzburg. We have been part of the Pietermaritzburg business comunity since the inception of the company in 1984, however, not operating out of the same premises all the time.
The company is proud to be a member of the Pietermaritzburg Chamber of Business and is actively involved in the growth and development of the city and its people. The company has a BBBEE contribution rating of Level 2 and we are proud of this achievement.
Ali Fab undertakes a wide variety of special projects in aluminium. Included in our abilities are
- Design
- Project management
- Installation
The type of project is very wide but all are based on aluminium. So if you have a project that requires the use of aluminium then AliFab will ensure it is completed successfully. Projects undertaken unclude: Millennium Dome: The Millennium Tower was built on the Bluff at the entrance to Durban Harbour to celebrate the new millennium. The lower section of the tower is reinforced concrete with the top section being aluminium. Pat Duffy of Vauda Thornton Consulting Engineers carried out the design in consultation with the staff at AliFab. Alifab detailed and manufactured the truncated cone and the structural projects department of Portnet erected it. Gantry Durban: Alifab designed, manufactured and installed a gantry in conjunction with BKS Consulting Engineers. The gantry had to be assembled inside the reservoir as it was a fully enclosed structure. A major challenge as managing the corrosion as the gantry would be partly submerged during the operating cycle of the reservoir. The reservoir was 120m in diameter the gantry has to rotate around the central tower. Pool Enclosure, Cape Town: Alifab designed, manufactured and erected a pool enclosure for an olympic size swimming pool at the University of the Western Cape in Cape Town. The structure spanned 44m in order for it to include grandstands. |
|
|